TSMC to start A14 mass production in 1H 2028
TSMC plans to begin mass production on its A14 process node in the first half of 2028, following risk production in 2H 2027. A14 capacity is expected to be 7.5x that of Intel's 14A, and SRAM bit cells will shrink from 0.021µm² to under 0.017µm² for the first time in eight years.
- A14 mass production set for 1H 2028, risk production in 2H 2027
- A14 capacity to be 7.5x higher than Intel's 14A
- SRAM bit cell shrinks from 0.021µm² to under 0.017µm²
- 15% higher speed or up to 30% better power efficiency
Read next
Hardware