CHT completes 4th Taiwan-Matsu subsea cable, boosting offshore resilience
Chunghwa Telecom announced on September 18 the completion of a nearly 300-kilometer subsea cable between Taiwan and the Matsu Islands. The cable has been laid, tested, and connected to the Taiwan-Matsu external communication network, enhancing regional connectivity resilience.
- Cable length between Taiwan and Matsu is nearly 300 km
- Cable laid, tested, and integrated into the network
- This is the fourth subsea cable on the Taiwan-Matsu route
Read next
Business