Intel installs production tools at Fab 62 in Arizona
Intel has begun installing production equipment at Fab 62 in Arizona, targeting operations by late 2028, though it has not disclosed which nodes the fab will make. The company also confirmed High-NA EUV insertion into high-volume manufacturing and installed the first major structural truss at its Ohio One site.
- Fab 62 will be Intel's sixth high-volume fab at its Ocotillo campus
- Fab 62 is slated to come online by the end of 2028
- High-NA EUV is now used in HVM for Panther Lake chips
- Intel gave no timeline for the first Ohio One fab
Read next
Hardware