LG wins Nvidia DSX Ready approval for 2.5 MW CDU
LG Electronics has received Nvidia DSX Ready certification for its 2.5 MW coolant distribution unit (CDU) for the DSX AI Factory platform. The unit is designed to cool groups of about 20 racks with Blackwell accelerators, where power density reaches 2.4–2.5 MW. LG previously secured approval for 600 kW and 1 MW CDUs.
- 2.5 MW CDU approved for Nvidia DSX AI Factory platform
- One cooling group covers about 20 racks at 2.4–2.5 MW density
- Earlier approvals covered 600 kW and 1 MW CDUs
- LG Energy Solution BESS also received DSX Ready status
Read next
Hardware