New drone video shows Tesla’s Optimus Factory reaching a turning point
Construction of Tesla's Optimus robot factory at North Campus Gigafactory Texas is nearing completion of the steel frame: about five column grids remain to the north beam. Concrete is being poured on the top three floors, with foundation work ongoing in parallel. Mass production is planned for summer 2027.
- Steel frame nearly reached north beam — about 5 column grids remain
- Concrete poured on top three floors, foundation rebar in parallel
- Goal is to launch mass production of Optimus in summer 2027
- Musk's long-term goal is 10 million Optimus robots per year
Read next
Business