First grid-tied 250kW sodium-sulfur battery system commissioned for mineral refining
In Brisbane, the first sodium-sulfur battery with 250 kW capacity and 1.45 MWh energy storage has been connected to Australia's National Electricity Market. The NGK Insulators system provides up to 6 hours of discharge and powers critical mineral processing at the Lava Blue site alongside a 200 kW solar plant.
- Capacity: 250 kW, 1.45 MWh, over 6 hours of discharge
- NGK Insulators battery connected to Energex grid in Brisbane
- Lava Blue site is Australia's first industrial solar-powered facility
- More than 80% of the control unit was made in Australia
Read next
Science