Nvidia and Foxconn disclose robot yield data on GB300 NVL72 line
Nvidia and Foxconn published the first measured production data for AI-trained robots assembling GB300 NVL72 at Foxconn's Houston factory: busbar installation success exceeded 95%, multi-connector insertion reached 90–95%. Nvidia's overall yield target is 99.5%, while current busbar cycle time is about 160 seconds versus a 124-second goal.
- Busbar installation success exceeded 95%, connector insertion reached 90–95%
- Nvidia's overall yield target is 99.5%
- Busbar cycle time is about 160 seconds versus a 124-second target
- The robots run on the Isaac GR00T N1.5 model
Read next
Hardware